Results 1 to 18 of 18
  1. #1
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766

    How long should an engine rebuild take?

    Just curious what the typical time frame is on an engine rebuild? Not for a guy working in his garage on the weekend but a shop with a couple of lifts n such.
    Flowmaster Amer. Thunder cat-back, 18" Roush chrome wheels, 4:30 FRPP gears, Mac LT's, Mac o/r H-pipe, Steeda X2 balljoints, MM cc plates, MM alum rack bushings, forged bottom end: Manley rods, Diamond pistons.

  2. #2
    Crazy SVT Poster
    Join Date
    January 2008
    Location
    Brick NJ
    Posts
    303
    it really depends on how much work the shop that is building the motor has. a friend of mine dropped his off to a shop and it took about 2-3 weeks before it was refinished

  3. #3
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766
    2-3 weeks? How about 3+ months!?!

  4. #4
    Insane SVT Poster
    Join Date
    April 2009
    Location
    Parts Room
    Posts
    1,243
    Quote Originally Posted by edswhite99 View Post
    2-3 weeks? How about 3+ months!?!
    Sounds typical.

    Ive been screwed by EVERY SINGLE shop Ive ever been to.

  5. #5
    Insane SVT Poster
    Join Date
    April 2009
    Location
    Parts Room
    Posts
    1,243
    The one thing Ive learned is NEVER give a machine shop money up front.
    It will not get your shit done any quicker.

  6. #6
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766
    I gave this particular shop half up front.

  7. #7
    Insane SVT Poster
    Join Date
    February 2005
    Location
    IL
    Posts
    1,010
    Sounds like your getting frustrated and ready to tell us your story.

    I put popcorn in microwave.
    2001 Mustang Cobra
    Eaton Conversion w custom brackets
    Stage 4 ported Eaton, TB, and Plenum
    2.93 Upper 4Lb lower, T56, 3.73 gear
    527WHP 549WTQ

  8. #8
    SVT God TBCobra's Avatar
    Join Date
    February 2008
    Location
    Midland,TX
    Posts
    8,170
    Quote Originally Posted by V6&V8SHO View Post
    Sounds like your getting frustrated and ready to tell us your story.

    I put popcorn in microwave.
    I hope you made enough for two.
    2004 GT: Sold
    2001 Cobra: Sold
    2003 Cobra: Sold
    1987 5.0: Sold
    2003 Mach 1: Current

  9. #9
    SVT God gt347mustang's Avatar
    Join Date
    June 2006
    Location
    Colorado
    Posts
    1,691
    2-3 weeks is super fast time.

    1-3 months is more typical.
    2003 Black Cobra with a mach 1 intake and other goodies!
    2001 Lexus IS300 daily

  10. #10
    Crazy SVT Poster Zacharyx's Avatar
    Join Date
    April 2010
    Location
    GA
    Posts
    744
    really depends if the shop pulling/reinstalling engine is also the machine shop, and if everything you want is in stock. I waited 4 months for my rotating assembly, but that was not the machine shop's fault ( i called 3 other shops to see if they could get it faster just to check). If a machine shop is good they tend to stay busy. Are you using a speed shop or your normal repair type shop?


    if I have the replacement engine on hand me and a friend can normally do a swap in 6 hours or so ( main reason I keep a spare block around)

  11. #11
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766
    Its a performance shop. They pulled the block an sent it to machine shop.

    Oh and to the asses who chimed in above me, yeah I am a little frustrated cuz over the past month it's been it will be ready by Friday....

  12. #12
    USCG 98 Saleen Cobra's Avatar
    Join Date
    February 2007
    Location
    Campbell, CA
    Posts
    14,735
    Lets see my custom diamond pistons just got here after about a month.. The machine shop is about 4-6weeks out right now due to race season. Typically a engine rebuild is about 3-4 months.. You also have to factor in that it is race season right now and that means blown engine which means more work for machine shops.. Lets put it this way my car has been down for a year if 3 months is a long time for you then ya lol.. you don't really have my sympathy lol... Best of luck to ya though
    98 Cobra - AED Built Motor - Foxlake Racing - Accufab Racing - F.A.S.T - Griggs Racing - Vortech - Kooks - Weldon - T56 Magnum - Built Rear End - HRE's - Baer - C&R - E-85
    AEDHP

  13. #13
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766
    Quote Originally Posted by 98 Saleen Cobra View Post
    Lets put it this way my car has been down for a year...



    Oh and I don't want your sympathy

  14. #14
    Crazy SVT Poster Zacharyx's Avatar
    Join Date
    April 2010
    Location
    GA
    Posts
    744
    Only way to keep from having down time is to build a complete engine on the side, and have a really good working relationship with your machinist ( and hope his wife is out of town so he can work late LOL).

    Also remember the guy who spends $$$$ ( weekly race series guy, etc...) with the machine shop gets bumped to the front of the line often

    your 3 months seems pretty quick unless you were given a completion date by the shop that was earlier

  15. #15
    Banned 01cobravortech's Avatar
    Join Date
    February 2004
    Location
    New Jersey
    Posts
    20,630
    VT Engines took 8 months on mine.

  16. #16
    Crazy SVT Poster edswhite99's Avatar
    Join Date
    March 2005
    Location
    Houston
    Posts
    766
    This is my first time dealing with this particular shop. The guys are cool but don't tell me my cars gonna be ready by a certain date and go weeks past it. I understand stuff happens. I just miss my car.

  17. #17
    Banned
    Join Date
    June 2010
    Location
    Goat Land
    Posts
    965
    When you drop a car at a shop(performance), is it ok to ask the shop how long its going to take before the car is done? or is the shop going to think that you are trying to rush them.

    Thanks
    Btw, not hijacking the thread

  18. #18
    Crazy SVT Poster Zacharyx's Avatar
    Join Date
    April 2010
    Location
    GA
    Posts
    744
    Quote Originally Posted by kimm123 View Post
    When you drop a car at a shop(performance), is it ok to ask the shop how long its going to take before the car is done? or is the shop going to think that you are trying to rush them.

    Thanks
    Btw, not hijacking the thread
    it is fine to as for an estimated time, just understand that there are some delays beyond their control. Again for engine's it is just best to build/buy a complete one on the side if you are worried about down time. Then there is very little that can delay you driving your car

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •