I am finishing up some new prototypes right now. Then machining the Blades while the TB's are out at anodizing. :coolman:
Once I get them assembled I will be installing them on some local Motor City Terminator Cobras for testing. :beer:
Please do not Post, PM or Email me about wanting to test one as I already have those test vehicles lined up (from stock to Whipple/KB) :idea:
testing will take about 2-3 weeks :sleeping:
THEN and only then will I start production of TB's :dw:
The first side of JUST the main TB housing takes about 36 min's...
I plan on running about 1-4 hundred....
36 Min's X 400 = about 233 hours.... and there are 4 sides to machine, Blades, cams, buttons, bushings, ect..... so that should give you an idea when they will be done. :read:
I have started a list of people that would like a TB. If you would like to be added to this list, please send an email with "Throttle Body" in the subject line to [email protected]
Depending on how big this list gets will determine how many TB's I make. :thumbsup:
Doug
BilletFlow
Once I get them assembled I will be installing them on some local Motor City Terminator Cobras for testing. :beer:
Please do not Post, PM or Email me about wanting to test one as I already have those test vehicles lined up (from stock to Whipple/KB) :idea:
testing will take about 2-3 weeks :sleeping:
THEN and only then will I start production of TB's :dw:
The first side of JUST the main TB housing takes about 36 min's...
I plan on running about 1-4 hundred....
36 Min's X 400 = about 233 hours.... and there are 4 sides to machine, Blades, cams, buttons, bushings, ect..... so that should give you an idea when they will be done. :read:
I have started a list of people that would like a TB. If you would like to be added to this list, please send an email with "Throttle Body" in the subject line to [email protected]
Depending on how big this list gets will determine how many TB's I make. :thumbsup:
Doug
BilletFlow
Last edited: