After a being busy with a bunch of other things, I finally got out to the garage today. Just been a busy month with other things besides the car. Got the frame rail notched, the lower torque box reinforced and all welded up. Finally got the tub welded in place. I also dressed the welds and cleaned up all the edges (after I took the pics below). Crappy pics but but now this week I can seam seal everything and get some paing on it and then get the other side done starting probably next weekend.
So I got got chance to spend a few hours in the garage today, so with the drivers side tub finished I moved to the passenger side. I got the floor and many of the unnecessary brackets cut out and the frame and torque box notched and worked on cutting a trimming the tub to fit. Doesn't look like much but it's a few hours worth of work to get everything fitting nice.
Now next time I get out there I just have to cut the steel and weld it into the frame notch and the lower torque box like I did on the drivers side. And then weld in the tub.
Image if I ever got a full day in the garage, LOL. Although I must say this side was 100 times easier and faster than the drivers side, well because I have already done it once and know just about where everything needs to be cut or modified.