Whats up everyone,

Heres my turbo build thus far.

-Pt7675 billet wheel ceramic coated hot side
-cg fab hot side
-twin 39mm waste gates
-55mm bov
-HPX-e maf
-3"ic piping
-garret 750core (will be making my own ic)
-fuel return, 8/6 with FIC1200s
-e85 mostly, 91 oct for oh shit moments
-goal is low boost 600s, high boost close to 900
-gt500 Triple pass with 1" bungs
-J2fab 7gal trunk tank with EMP
-mach1 lower, cobra lid, 1/2" spacer

-Started off with my own battery tank I make but decided to go with j2fab trunk tank, 1" bungs for gt590 triple pass, EMP modded pump, should help with iats.
-4"down pipe im making will be routed to 3"axle backs eventually.
-Innovate SCG-1 for boost control and wide band

You can see the difference between the Dual ass and the Triple pass making it a no brainer for cooling in this situation.

***Videos added on page 5***

currently 18psi 817hp 804ftlbs on e85

Feel free to ask questions, request photos, or help with build, you can follow the build on ig also at #svt_turba

IMG_20190211_172428_412.jpeg
IMG_20190320_104319_146.jpeg
IMG_20190413_090609_728.jpeg
IMG_20190622_154533_818.jpeg
IMG_20190206_120452_272.jpeg
IMG_20190206_120347_255.jpeg
IMG_20190218_135949_549.jpeg
IMG_20190426_220613_981.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 
Last edited:

2fst4urtrk

OHIM2FST4U
Established Member
Joined
Apr 29, 2006
Messages
961
Location
Delaware, Ohio
Was able to finish the final mock up of the intercooler. Going to be tacking amd welding this later in the week. Its a Garret 750hp core with 1" bungs, generic air side end tanks. Imade the water side end caps our of 1/8 5052 with my mini finger break from swagg offroad for the harbor freight 20ton press.
20190716_092148.jpeg
IMG_20190716_093016_551.jpeg
IMG_20190716_162737_600.jpeg
20190716_143359.jpeg
IMG_20190716_162737_584.jpeg
IMG_20190716_162737_595.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 

2fst4urtrk

OHIM2FST4U
Established Member
Joined
Apr 29, 2006
Messages
961
Location
Delaware, Ohio
Took a 01 cobra coolant crossover and deleted the radiator bypass hose, also changing the angle of the upper radiator hose.

I was able to finish the rest of the welding on the downpipe. once the bumper is back in ill be notching it for the exhaust to dumper under the bumper.
20190727_153546.jpeg
20190727_233416.jpeg
20190727_233428.jpeg
IMG_20190728_090504_286.jpeg
20190728_012252.jpeg
20190728_012259.jpeg
20190728_012303.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 

2fst4urtrk

OHIM2FST4U
Established Member
Joined
Apr 29, 2006
Messages
961
Location
Delaware, Ohio
I got the J2fab 7g tank in, 1" hoses ran, waiting for a few last parts to wire in the EMP water pump in the trunk.

Side note its a real bitch to get those 1" lines over the IRS and over the passenger wheel well.
IMG_1566073404641.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 
Last edited:

2fst4urtrk

OHIM2FST4U
Established Member
Joined
Apr 29, 2006
Messages
961
Location
Delaware, Ohio
J2fab 7gal tank in final resting place, all 1" lines ran and plumbing rough in is done. Waiting for the intercooler to get back so i can get it in. Im limited to 180amps out of my welder so i had my buddies fab shop weld the intercooler since it needs around 225amps.
20190904_151651.jpeg
20190904_151643.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 
Last edited:

gimmie11s

I Race Pontiacs
Established Member
Premium Member
Joined
Jun 1, 2004
Messages
18,488
Location
la la land

2fst4urtrk

OHIM2FST4U
Established Member
Joined
Apr 29, 2006
Messages
961
Location
Delaware, Ohio
well,

The good news is the intercooler I made fits, my welding machine only would go up to 180 amps so I had my buddies weld everything. You can tell what he does for a living lol....

The bad news is I didn't measure right and have to notch the bumper to clear the BOV lol. Garrett 750hp core with 1" water bungs and 3" piping. All in all im very happy and cant wait to get her running. Mock up is about 95% done, just need some o2 bungs welded on and a flex pipe on the waste gate tubing then all parts are off for paint and ceramic coating.
20190910_165709.jpeg
20190910_165832.jpeg
20190910_165808.jpeg
20190910_165713.jpeg
20190906_224648.jpeg
20190906_222638.jpeg


Sent from my SM-G930V using the svtperformance.com mobile app
 