I've noticed a few signatures with an order to be built on 7/15. Mine is scheduled for that date also. Any concerns for a build on the first Monday after the factory's two week shutdown???
Originally posted by lugnut
I just called VOPC on the way to a clients site.
The scheduled build date that I had of 7/15 for the last several weeks has been pushed back to 7/22.
Maybe it's a good thing... Perhaps it'll give the UAW guys enough time to get back in the groove following their vacation!
:beer:
Anyway, I can't complain. Been waiting since February (actually put my deposit down in May ;-) ). At least I now have an ETA of 7/29.
I guess we'll have to wait and see if that gets slid back too.
JB
Originally posted by Snakebite
Petzuk
My black coupe is due to be built on the 15th as well. I dont look at it as a detriment to be built after shutdown....as a matter of fact...I think it may have some positive points. The assembly line personnel should be well rested and comfortably cool as compared to some of the HOT ass weather we have had the past couple weeks...and...the shutdown allows for line, assembly, and QC tweeking. Just my spin on the issue...I have no other choice but to be positive!!!!:burnout:
BTW...My Ford Bud is working on gettin me in the DAP to watch the build next week...Im flippin geeked!!!
Originally posted by trex
i think that is the week mine is to be built but not sure has been changed 3 times .ordered in early feb. mine is a torch red coupe