Home
What's new
Latest activity
Authors
Store
Latest reviews
Search products
Forums
New posts
Search forums
What's new
New posts
New listings
New products
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
Cart
Cart
Loading…
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Search titles only
By:
Menu
Log in
Register
Navigation
Install the app
Install
More options
Change style
Contact us
Close Menu
Forums
Cobra Forums
The Terminator
Terminator Talk
What did you do for your Terminator today?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="c6zhombre" data-source="post: 16048488" data-attributes="member: 76381"><p>Damn that sucks! I know your house has to be fairly new....I would not be shocked at all if the slab is still gassing considering the conditions we've had, the water tables never go down very far making concrete curing duration last stupid amounts of time.</p><p></p><p>During the construction, right after the cover inspection but before the sheetrockers showed up.....I insulated the walls. Then blew in pink panther above the ceiling after I closed. Waited 2.5 years from the slab pour and layed down my epoxy floor. It's really dry in there now. Now if Santa brought me a minisplit, I might live out there lol.</p></blockquote><p></p>
[QUOTE="c6zhombre, post: 16048488, member: 76381"] Damn that sucks! I know your house has to be fairly new....I would not be shocked at all if the slab is still gassing considering the conditions we've had, the water tables never go down very far making concrete curing duration last stupid amounts of time. During the construction, right after the cover inspection but before the sheetrockers showed up.....I insulated the walls. Then blew in pink panther above the ceiling after I closed. Waited 2.5 years from the slab pour and layed down my epoxy floor. It's really dry in there now. Now if Santa brought me a minisplit, I might live out there lol. [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Cobra Forums
The Terminator
Terminator Talk
What did you do for your Terminator today?
Top