I'm in the process of swapping out my 8.8" rear end for a 9"
I have already received the Currie housing, the 35 spline axles and brake brackets will be here on Wednesday.
The 3rd member is being built and should be shipping mid week.
So far I have also purchased a BMR panhard bar relocation bracket.
I already have a set of BMR LCA relocation brackets and swaybar relocation brackets.
I have a Powerhouse 1 piece aluminum driveshaft with 1330 u-joints.
I have also ordered a Spicer 5-648x conversion u-joint to bolt up to my 3rd member.
Does the driveshaft need to lengthened or shortened?
Any other suggestions?
I have already received the Currie housing, the 35 spline axles and brake brackets will be here on Wednesday.
The 3rd member is being built and should be shipping mid week.
So far I have also purchased a BMR panhard bar relocation bracket.
I already have a set of BMR LCA relocation brackets and swaybar relocation brackets.
I have a Powerhouse 1 piece aluminum driveshaft with 1330 u-joints.
I have also ordered a Spicer 5-648x conversion u-joint to bolt up to my 3rd member.
Does the driveshaft need to lengthened or shortened?
Any other suggestions?