well as most of you know i have eaton on my 2v. well i blew the tranny at the last meet and it was down for the winter. while down my now wife told me i should think about gettin the car built to how i like it before the wedding. well between paying for a wedding and all that i had rob build me a motor. well i decided to do it right this time so i went with 03 cobra crank and rods and a nice new set of diamond pistons. picked up a set of MHS stg2 heads thanks to mister force with comp 270 cams. dropped it all off to rob for him to work his magic. while waiting i picked up 2 gt pumps,stg2 fpdm, 80# injectors, subframe connectors, upper and lower control arms, battery relocation kit and a vortech ice box. forgot to add thanks to posi for porting everything for me and gettin my billet flow hub on for me. now on to some pictures.
tear down begins
decided to paint some parts
then some parts showed up
putting it back together
and how it sits now
waiting on my 6 pound lower and new k member to get here this week or first of next. then its off to lee to set it on kill with e85. hopin for 550 plus but we will see
tear down begins
decided to paint some parts
then some parts showed up
putting it back together
and how it sits now
waiting on my 6 pound lower and new k member to get here this week or first of next. then its off to lee to set it on kill with e85. hopin for 550 plus but we will see