So I pulled and dropped my transmission off to be built last Saturday. Trans guy said he would dig into it and call me with parts list asap. Well today is Thursday and not having heard from him I called him after lunch expecting some sort of information. Well he tells me it's next on his list he is finishing up another transmission, me being aggravated ask him to give me an eta because I have other things on my agenda with the mach and it's holding up a hoist. He pretty much blows off me saying he will get to it asap. Feeling kind of at his mercy I agree. So now I'm pretty much irritated and I don't want to over step and be an ass and piss him off then make my bill sky high. What do you all think is an average turn around time for a trans build? I dropped it off to him at his suggested time after he tells me he can knock it out. Only thing wrong was 2nd gear synchro however I told him I want it stout. Told him replace what's needed with premium parts because I don't want to have to rebuild this trans again. So am I being far to impatient or did this guy just sucker me into dropping it and fixing it at his leisure. It's irritating because I've used him many times with auto trans and he gets them done and out fast. This time I pulled my trans and took it to him thinking a week and it'd be done. He hasn't even looked at it yet. Anyways thought?