Well, here are a few pics from the build. The swap is finally finished. Took about 3 days to tear down, and 2 to re-install. Somewhere around 30 hours I'd say total. Not straight working on it, but off and on over about a week. A big thanks goes to Archie for basically installing the set-up for me and helping out with a lot of stuff. He's machgsxr on here and M1R. Just waiting for my wideband that's on back order to start tuning.
The wires in the last few pics are getting plastic covering soon. I have a couple of things to button up this evening.
:beer:
The wires in the last few pics are getting plastic covering soon. I have a couple of things to button up this evening.
:beer: