I’m sure it’s operator error. Lol I think a week and a half. Culvert inspections after it’s installed. They did tell me two weeks. Not sure what that is, but nothing going under the base. I guess per the guys I’m getting a 6” base vs the standard 4”.Or sideways? Lol. Progress looks good. Whats the proposed finish date? Will they put a layer of geotextile down prior to the stone bed?
Not sure why the pictures look blurry.
Fixed.Or sideways? Lol.
Thanks, really not a issue here. Most of all the new houses here being built are using pavers for driveways.Geotextile is a woven fabric. Its used pretty often up here on driveways that are just a stone base and paver drives as well. It basically creates a layer to stop your stone base from disappearing into the sub base.
Two weeks total I guess. Inspections even on a driveway. Got a few cable issues that need to dealt with that I mentioned above.Going to look great when done.
Parts of my driveway are not looking so great, but no so bad yet. Just some low spots, mostly from parking.
How long till complete for the new driveway?
I agree on the dirt. It's a real PITA right now, as we have to walk through that dirt to go in and the garage floor is a mess right now.New driveway is going to look great!
I'm so fussy with my vehicles I don't know how people deal without having some sort of hard surface driveway. Not to mention the amount of dirt that gets dragged into your garage and house.
I built a new house about 5 years ago. My driveway is exactly 1/2 mile for the road to my garage. I had the entire thing paved. Wouldn't drive any of my Mustangs up and down the driveway until it was done.
I agree on the dirt. It's a real PITA right now, as we have to walk through that dirt to go in and the garage floor is a mess right now.
It sure does Jerry.as least with that nice coating it should clean up easily enough
What is this here??
Culvert pipe for drainage under the driveway.What is this here??