I was looking at stegs port Stage 5+ Accufab welded PL for Max opening for 895 dollars. What does this mean? Do I have to pay 500 dollars for a accufab and then send it to steg along with my eaton for him to port for 895 dollars or When I send my eaton alone and he puts a accufab with plenum welded to the eaton and sends it back to me for 895 dollars.
Last edited: